A project to restore and repair a 100-year-old dam near Duluth received a 2021 Grand Award in Engineering Excellence by the American Council of Engineering Companies of Minnesota. The award was presented at ACEC/MN’s virtual awards gala on February 26.
Minnesota Power hired Barr to develop and implement a solution to replace the Island Lake Dam’s aging sluice gates, which reduced power generation and posed operational, environmental, and safety risks. The dam’s unusual features, including an arched structure and gates located 50 feet under the water’s surface, presented unique challenges to the team charged with safely accessing and repairing the gates.
Barr provided stability analyses, a comprehensive options study, engineering design, and detailed construction sequencing. Collaboration with Minnesota Power and construction contractor J.F. Brennan Company, Inc. led to innovative engineering methods that helped manage costs and scope. The award-winning outcome: successful replacement of the sluice gates and improved operability, resulting in enhanced support for downstream hydro facilities plus sustained recreational and environmental benefits.
Need help on your next dam project? Learn more about Barr's dam engineering services or contact our team today.
Tor Hansen is a vice president and senior civil engineer with over 25 years of experience working primarily on structural design, inspection, and rehabilitation projects. His experience includes designing reinforced concrete, steel, timber, and precast concrete structures such as dams, buildings, equipment supports and foundations, waterfront structures, and equipment bridges.
Island Lake Dam repair project wins engineering award
Barr establishes office in Reno to support client projects
Navigating new S-K 1300 reporting standard
Addressing the risks of acid-generating materials
Renewable natural gas projects turn waste to energy
Brownfields open doors for clean-energy development
Receive the latest editions right to your inbox and explore industry trends, projects, and company news.
Reagent supply challenges to realizing U.S. critical minerals production goals
Restoring impaired lakes through adaptive management
New EPA standards for oil and natural gas storage tank venting systems
New wastewater discharge standards for coal-fired power plants
Hometown flooding experience inspires career aspirations
Choose your own adventure as an intern at Barr
Internship offers real-life experience in the Canadian oil sands
EPA finalizes GHG standards for electric power generation industry
Improving the ecological health of natural areas within your park system
From teenage errand boy to chief marketing officer
Ready or not, artificial intelligence is here to stay
Certain PFAS now designated as hazardous substances under CERCLA
EPA releases maximum contaminant levels for PFAS in drinking water
Envisioning reuse: The next chapter in the story of industrial water
Hear more about water reuse from Barr's experts
Project: Turning a facility’s wastewater into process water
Project: System evaluation to achieve zero liquid discharge
Navigating the storm: Effectively managing industrial stormwater
Seeing the picture below ground
New PFAS reporting requirements under TSCA
Engineer makes a career, and a hobby, out of modeling
Addressing water scarcity: A case study on aquifer storage and recovery projects
Stack test method OTM-50 announced to measure PFAS in air emissions
Q&A: From operations-based site experience to practical geotechnical mining solutions
Revolutionizing tomorrow through technology and innovation
Cost of removal and destruction of PFAS from wastewater effluent
4,000 wetlands and counting: Journeys of a wetland ecologist
Managing risks when decommissioning PFAS-impacted facilities
Developing a sustainable mine closure vision
Ecosphere Environmental Services, Inc. staff join Barr
A zoo with a view: Treetop Trail opens
Clean water for the Yanesha people of Peru
Adding RNG to your energy portfolio
Happy holidays from all of us at Barr!
Watershed-wide analysis improves strategies to manage climate change
An ecosystem approach to watershed planning and water resource protection
Stormwater O&M: When construction ends, the work begins
How will changes to the TRI/PFAS reporting rule affect your facility?
Barr brings a straightforward approach to Minnesota PFAS cost estimate study
Diving into the data as an air quality specialist
How safe is your tailings dam?
New technology expands access to solar energy
Slope repair puts solid ground under the skis
Creative solutions result in time and cost savings for clients
University flips the switch to “dark-sky-friendly" lighting plan
EPA program connects partners for sediment restoration
MSHA proposes new silica-exposure standards
The evolution of PFAS analytical methods over the last decade
Mining the Intermountain West: From operations to consulting
Six reasons to add RNG to your energy portfolio
Balancing power generation with air quality compliance
Wind turbine foundations now and in the future
Summarizing recent changes to NEPA
Making the most of every opportunity
Gaining real-world experience through Barr’s internship program
From a client’s perspective
Using waste heat recovery for carbon management
Minnesota's mine-reclamation legacy enters exciting new chapter
Building climate resilience through green infrastructure design
Navigating CCR compliance under recent EPA determinations
Municipal waste stream PFAS removal and destruction: Current alternatives and cost
EPA proposes rule to reduce ethylene oxide emissions from commercial sterilizers
Barr celebrates Founders Day: A CEO’s perspective
Five steps to develop a greenhouse gas inventory for agricultural manufacturing
How will the new PFAS MCLs affect NPDES permits?
Time to repower your wind energy site?
Foundation assessment a critical first step for wind repowering
New heat-sensing drone sees the unseen
Natural resources plan addresses city’s changing ecosystem
To heal nutrient-impaired lakes, apply persistence and resourcefulness
EPA proposes maximum contaminant levels for six PFAS
Two projects honored for engineering excellence
Adding lithium to mining operations: Environmental, permitting, and ESG factors
Adding lithium to mining operations: Engineering and design factors
Collecting data from the skies with reality capture technology
Green infrastructure and stacked-benefits projects
EPA proposes maximum contaminant levels for six PFAS in drinking water
Minnesota DNR releases new commercial solar siting guidance
Emerging PFAS destruction technologies
The Inflation Reduction Act: Manufacturing focus
Domestic uranium production on the rise
EPA's latest proposed rule eliminates PFAS reporting exemption
Introducing Barr’s ugly holiday sweater contest winner
Civil designs create homes for the holidays
Designing Africa's first potash processing facility
Q&A: Are mussels impeding your underwater project?
EPA begins enforcement of coal-ash disposal rule
Floodplain management expert joins Barr
From our CEO
Designing Africa’s first potash mine
The Inflation Reduction Act: Mining focus
The Inflation Reduction Act: Power focus
A deeper look into the promising new PFAS destruction approach
Tailings storage facilities: A unique challenge for a critical industry
The Inflation Reduction Act: Fuels focus
Making an impact in the Rocky Mountain Region
From Boy Scout to Senior NEPA Consultant
Stabilizing a community's backup water supply
Q&A: In your ESG journey, keep the destination in mind
Inflation Reduction Act opens door for energy investment