Civil engineering services for 10 MW solar facility

About this project

Client
Minnesota Power
Location
Camp Ripley, Minnesota
Cost
$25 million
Completion date
contruction completed in 2017

Minnesota Power developed a new 10 megawatt (MW) solar facility of approximately 80 acres at the Minnesota National Guard’s Camp Ripley site in the northern part of the state. As a subcontractor to Hunt Electric Corporation, Barr provided civil engineering services related to construction of the project, which was the first utility-scale solar facility permitted and constructed in Minnesota. 

Barr prepared the civil engineering design, including road-way layout and elevation design. We conducted hydrologic and hydraulic analyses to evaluate stormwater-runoff flow paths, designed drainage features, and developed a grading plan to reduce site slopes and minimize low areas where water could pool. Stormwater runoff is directed into centralized swales and conveyed through culverts under the site-access roads. We also prepared a construction SWPPP for the site and designed interior and perimeter roads to provide access for delivery trucks and emergency vehicles.

Key team members

Joel Bahma
Vice President
Senior Structural Engineer
Jeremy Gacnik
Senior Civil Engineer